The construction company CEYD was awarded the competition in 2009. The project was part of a municipal programme to transform the main urban streets, with the aim of reorganising parking and improving traffic conditions and pedestrian use of the city.
The intervention combined the development of an underground infrastructure with the remodelling of the avenue and its urban surroundings. During construction, the car park, initially planned on two levels, was reduced to a single floor, with a total of 159 spaces for residents. The built complex included two vehicle access ramps and several pedestrian accesses, including lifts, integrated into the surface urban development. The works took place between 2010 and 2012, when the car park obtained its opening licence.