← Own practice
Year
2010 – 2011
Location
Salas, Asturias, Spain
Typology
Nursery
Client
Salas Town Hall
Phases
Competition 2010 · 1st prizeConstruction 2011
Surface
800 m² (gross surface)
Construction cost
€ 468,100

Nursery
0–3 years


Being the sports pavilion, the football stadium, the kindergarten and the primary and secondary school the only urban reference, the simple rectangular footprint of the building takes up the scale and orientation of the existing constructions, framing the small park between school and kindergarten towards the east.

The site is located on the edge of Salas, adjacent to an area destined to public facilities and facing the surroundings of the village with its meadows and forests. On an elevated platform, the classrooms and the service areas are arranged around the central multifunctional hall. Since the local climate with its very rainy, windy and cold winters does not allow for playing with the children outside during several months a year, the central multifunctional hall takes the function of a schoolyard. The indoor spaces are complemented by two outdoor playgrounds which are partially covered by the roof slab and protected by the perimeter wall. The elevated platform, the side walls and the roof slabs are expressed as one single element that is being wrapped around the conglomerate of spaces, protecting them from rain, wind and cold.

West façade with the main entrance
West façade with the main entrance01 / 27